Keepers

Filters

Showing 41–57 of 57 results

CRL H3718 White Right Hand Casement Window Lock with 2-3/8″ Screw Holes

$0.00
This universal handed CRL Casement Window Lock is used on steel or aluminum double windows with a narrow center rail. It is a diecast locking…

CRL H3856 Bronze Right Hand Casement Window Locking Handle with Offset Base and 1-1/2″ Screw Holes

$21.72
This CRL Casement Window Locking Handle is commonly used on metal framed windows and has an offset base. Has a plastic strike insert with the…

CRL H3951 Left Hand White Casement Window Lock 2-3/8″ Screw Holes

$22.42
This CRL Casement Window Lock has a white finish diecast housing with a steel locking mechanism and keeper. The sash lock is used by many…

CRL H3953 Right Hand White Casement Window Lock 2-3/8″ Screw Holes

$22.42
This CRL Casement Window Lock has a white finish diecast housing with a steel locking mechanism and keeper. The sash lock is used by…

CRL S4000 Aluminum Window Thumbscrew Lock – pack of 2

$5.58
Made heavy-duty zinc diecast housing, the CRL Window Thumbscrew Lock securely locks your window in a closed or open ventilating position with the turn…

CRL S4001 Black Window Thumbscrew Lock – pack of 2

$0.00
Made of heavy-duty zinc diecast housing, the CRL Window Thumbscrew Lock securely locks your window in a closed or open ventilating position with the…

CRL S4032 Aluminum Tamper-Resistant Window Lock

$6.90
Made of heavy-duty zinc diecast housing, the CRL Tamper-Resistant Lock, securely locks your window in a closed or ventilating position. Utilizing a hex security…

CRL S4033 Black Tamper-Resistant Window Lock

$7.33
Made of heavy-duty zinc diecast housing, the CRL Tamper-Resistant Lock, securely locks your window in a closed or ventilating position. Utilizing a hex security…

CRL S4035 Black Tamper-Resistant Window Lock Dual Hex Screws

$6.90
Made of heavy-duty zinc diecast housing, the CRL Tamper-Resistant Window Lock, securely locks your window in a closed or ventilating position. Utilizing two hex…

CRL S4064 Aluminum Window and Patio Door Cam Lock

$9.54
This CRL Window and Patio Door Cam Lock develops a strong vise-like grip and helps prevent forced entry. Just slip it over the window…

CRL S4371 White Tamper-Resistant Window Lock

$0.00
Made of heavy-duty zinc diecast housing, the CRL Tamper-Resistant Lock, securely locks your window in a closed or ventilating position. Utilizing a hex security…

CRL S4372 White Tamper-Resistant Window Lock with Dual Hex Screws

$8.86
Made of heavy duty cast aluminum, this CRL Tamper-Resistant Window Lock securely locks your window in a closed or ventilating position. Utilizing two hex…

CRL S4544 White Sliding Window Lock

$12.24
This CRL Sliding Window Lock is designed to mount on most dual glazed windows. White nylon housing with a steel pin that has a…

CRL S4600 White Window Sash Flip Lock – 2/Pk

$9.48
The CRL White Nylon Flip Lock mounts onto bottom sill of sliding windows to act as a secondary security latch. It can also be…

CRL WH311KA Window and Door Chain Lock

$38.78
This CRL Window and Door Chain Lock has a heavy diecast key lockable base, with an 8" (203 mm) long chrome plated chain. Once…

Prime-Line F2588 Sash Lock, Zinc White

$7.38
WHITE VINYL WINDOW SASH LOCKSpecifications:Includes: FastenersSuitable for: Vertical or Horizontal Sliding Aluminum Wood Vinyl Windowdie-cast construction. Baked enamel finish. Used on aluminum or vinyl windows.…

Truth WH12433 Black 1-3/8″ Multi-Point Latch Actuator

$31.35
This lock has self-locating snap-on tie bar guides with a progressive locking action that guarantees positive sequential locking of window.…
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Description
  • Weight
  • Dimensions
  • Additional information
  • Add to cart
Click outside to hide the comparison bar
Compare
0
5